***2-3-26***Revising bid date to 2/12/26 at 12pm.  Please provide pricing as soon as possible.  Each building has to be priced to Duke Energy separately.  We also have a pretty in-depth technical proposal that is included in the pricing portion.  We greatly appreciate your help by getting us your proposals early.***

***1-27-26***I have consolidated all of the most up to date information we have on this page.  This page includes all of the 90% drawings for every building.  Please refer to “ECM 02 Cherry Point Decentralization” tab for any reference to 60% drawings.  90% drawings supersede the 60% drawings.  Buildings 1702, 1769, 1773, 4031, 4048, and 4305  remain the same as we already had 90% drawings issued for these buildings.

***Bid date extended to 2/13/26.  Please provide quotations by 12pm on 2/12/26.***

***RFI’s must be in by 2pm, Friday, January 30th***