***2-11-26-Reminder that pricing for this project is due tomorrow 2/12/26 at 12pm. Thank you very much for your cooperation.***
***2-3-26***Revising bid date to 2/12/26 at 12pm. Please provide pricing as soon as possible. Each building has to be priced to Duke Energy separately. We also have a pretty in-depth technical proposal that is included in the pricing portion. We greatly appreciate your help by getting us your proposals early.***
***1-27-26***I have consolidated all of the most up to date information we have on this page. This page includes all of the 90% drawings for every building. Please refer to “ECM 02 Cherry Point Decentralization” tab for any reference to 60% drawings. 90% drawings supersede the 60% drawings. Buildings 1702, 1769, 1773, 4031, 4048, and 4305 remain the same as we already had 90% drawings issued for these buildings.
***Bid date extended to 2/13/26. Please provide quotations by 12pm on 2/12/26.***
***RFI’s must be in by 2pm, Friday, January 30th***

Recent Comments